- LARGE AND MULTI-BUILDING
PROJECTS
- REPRESENTATIVE PROJECT LIST
-
- INTUIT
- MOUNTAIN VIEW, CA
A fast-track renovation of multiple
locations, including three on the North Campus as
well as two at a separate location. All work was
coordinated to allow a corporate move within ten
weeks of our joining the project.
Work included:
- Complete design of all Voice
and Network Rooms
- Redesign of Campus Cabling
Infrastructure
- Cabling construction and
equipment Budget
- Complete definition and
specification of internal voice and data
cabling and
Physical Infrastructure requirements
- Complete specifications and
drawings for the North Campus site
- Selection, negotiation with
Cabling Contractor in Bid situation
- Project management of cabling
installation during construction
- ADOBE SYSTEMS, INCORPORATED
- SAN JOSE, CA
ADOBE TOWER
Our work, in partnership with RLS/MCM,
included the complete base-building physical
infrastructure design of an eighteen story owner
occupied high rise under construction in San Jose. We
performed all construction and Information Technology
budgets relating to network cabling and equipment,
and developed contract documentation for bid..
ADOBE PLAZA
Renovation of six floors at a
expansion location near Adobe Tower on a very
aggressive schedule. Work has included the
modification of Adobe Tower specifications and
drawings to allow transfer of the technology design
to this new location.
- ALTERA CORPORATION
- SAN JOSE, CA
Consultation for Phase One of this 500,000SF
multiple building campus.
Consultation has included:
- Complete Physical Infrastructure
requirements for projected Information
Technologies
- Sizing and locating all required
Equipment Rooms; HVAC and Electrical estimated
loads; required vertical and horizontal
connectivity
- Close work with the Architectural
and Design/Build team to define options to
required infrastructure
- Two Cabling construction and
equipment Budgets
- Outside Plant conduit
recommendations
- PACTEL CORPORATION
- WALNUT CREEK, CA
Development and implementation of an
Internet Protocol addressing scheme, based on TCP/IP, and
a network management system for a 700 node network. This
was a management system for an integrated network
comprised of multiple Token Rings, Multiple Ethernets and
a high speed backbone.
Consultation included:
- Determination of Network
Architecture
- Development and Documentation of
IP Addressing Requirements
- Assign IP Addresses to Network
Devices
- Manage installation of Network
Management Hardware & Software
- Recommend and Document Network
Management Support and Operational procedures
- Develop Training Requirements and
coordinate training of Staff
- Develop Acceptance Test Criteria
and Coordinate Testing
- Coordination with Multiple Vendors
- Cutover to new Network Management
System
- AIRTOUCH CELLULAR
- SAN FRANCISCO AND WALNUT CREEK
Complete network implementation, cable
plant design and project management of 1,000 stations
receiving fiber-optic connections at a Research and
Design facility in Walnut Creek. We were involved with
the successful selection of a cabling contractor for both
the Walnut Creek and San Francisco sites and were also
engaged to project manage the implementation of the new 1,400
node network for both locations. This work included the
definition, configuration and negotiation for the "active"
network components during which we played the role of
acting members representing the in-house MIS team
responsible for coordinating various vendors and the
members of the Architectural/Engineering team.
BAY AREA CELLULAR TELEPHONE (CELLULAR ONE)
SOUTH SAN FRANCISCO, CA
Information Technologies design and
implementation for a new 60,000SF location. Consultation
for complete scope of Information Technologies and
Security and Paging systems. Areas of work included:
Preliminary Design
- Architectural coordination
- Computer Room Design
- Definition of all Information
Technology physical infrastructure requirements
- Review of existing documentation
for all Electrical, Mechanical coordination
Information Technologies Design
- Complete Specifications and
Request for Proposal for Voice and Data Network
Requirements, Security and Paging Systems
- Complete Specifications and
Request for Proposal for "Active"
Network Components; i.e. Concentrators, Hubs
Project Management
- Project Management during entire
cabling, equipment installation and computer Room
migration process
- OCTEL COMMUNICATIONS, INC.
- MILPITAS, CA
Our consultation has concentrated on
the Physical and Cabling Infrastructure required to
support this 350,000sf information intensive Campus
development.
In coordination with Octel we have:
- Reviewed and annotated all of the
current Information Technology studies and A/E
Contract Documentation
- Developed Laboratory, Corporate
and Engineering Computer and PBX Room plans and
equipment requirements throughout the facility
- Developed Network Equipment Room
plans and equipment requirements throughout the
facility
- Redesigned the campus conduit
connectivity
- Redesigned the current cable tray
concept
Contract Administration
responsibilities during the construction phase include:
- Project team coordination and
schedule development
- Project partnering and kickoff
meetings
- Construction and Voice/Data Group
Coordination Meetings
- Site Observations
- On-site coordination during moves
- Final Punch-list
- Quality Assurance and Final
Acceptance
- 3COM CORPORATION
- SANTA CLARA, CA
Design and Project Management
responsibilities for the entire Information Technologies
design team for a 300,000SF, four building campus network
design and implementation.
Consultation included:
- Development of basic Information
Technologies cabling and distribution concept
- Review of complete Architectural
and Engineering documentation to assure
conformance with defined Information Technologies
requirements
- Coordination with systems
furniture manufacturer for development of custom
"technology port"
- Scheduling and Critical Path
development of Information Technologies
- Site Inspection during
construction
- PACIFIC GAS & ELECTRIC
- SAN FRANCISCO, CA
Project Managed a phased move of 2200
PG&E employees during a six month period.
Consultation included:
- Serving as a "data analyst"
resource to the internal PG & E group (ITS)
responsible for all data and voice design
services to PG & E
- Responsibility for acting on
behalf of PG & E with all internal "end-users",
establishing requirements, writing "service
orders" and defining ITS requirements at
project meetings
- "Cut-over" assistance
and coordination
- CISCO SYSTEMS
- SAN JOSE
Preliminary design of a computer room
complex for a 500,000sf campus facility.
Consultation included:
- Infrastructure design to support
required Information Technology
- Computer room complex layouts and
Architectural/Engineering coordination
- Definition of all Campus conduit
interconnections, location, sizing and
design of IDF closets
- Review of "generic"
building design
- Cabling network design and budget
estimate for the Voice and Data
Communications Cabling System including active
network components
- AUTODESK
- SAN RAFAEL, CA
Master Planning for a 600,000SF campus
environment. Project included:
Information Technologies Requirements
- Complete review of current network
and equipment technologies. Direction on future
Data/Voice network options, preparation of a
report describing Network scenarios and
Architectural/Engineering consequences to be
incorporated in Design Development Drawings.
- Preliminary budget for all
Information Technologies components.
Physical Infrastructure
Requirements
- Completion of a report defining
consequences of anticipated Information
Technologies on the Architectural and Electrical/Mechanical
design including:
- Campus Civil Engineering
Data/Voice distribution options
- Complete review of
Schematic Design documentation including
network equipment room sizing and counts,
general distribution options, circuiting
(isolated and/or dedicated) loads and
requirements, PBX "node"
locations.
- AUTODESK
- SAN RAFAEL, CA
Retrofit of a existing 90,000SF
facility for administrative offices and software
development and support. Established and managed a unique
design/build team with the Client and Contractor.
Consultation included:
Network Design
- Worked with the Client to refine
and finalize the Physical Layer of Information
Technologies design and infrastructure.
- Established the location and fit-out
parameters of equipment rooms, closets and shafts,
cable way locations, outlet and device locations.
- Prepared electrical and HVAC
requirements definition for network equipment
rooms.
- Worked with the Client and
Contractor to develop the network cabling budget.
Network Cabling Specification
- Produced the RFP and documentation
of the Physical layer of the cable plant. The
specification includes the definition of cabling
to all nodes, vertical backbone cabling,
distribution methodologies, patching, rack and
rack accessory requirements, and the installation,
testing and acceptance criteria for the installed
Information Technologies cabling network.
- XES (XEROX ENGINEERING SYSTEMS)
- SAN JOSE, CA
We were responsible for Project
Management and the cabling RFP for this 125,000SF
engineering and administrative campus facility.
Consultation into the early
construction phases included:
- Definition of project goals,
definition of Client responsibilities and
definition of Project deliverables.
- Complete Project Management of
Network Design team to deliver:
- Integrated Voice/Data
Network Design.
- Cabling Request For
Proposal.
- Active Components Request
For Proposal.
- HILLS BROS. COFFEE, INC.
- SAN FRANCISCO, CA
Network implementation and project
management for this 125,000SF facility. Provided
assistance to the architect in the modification of the
base building design to accommodate requirements of the
clients information technologies. This included
sizing, locating and planning the 6,000sf Computer Room
and the addition of four network closets on each floor
which became integral in the planning process.
-
- POMONA VALLEY HOSPITAL MEDICAL CENTER
- POMONA, CA
This project entailed the retrofit of a
450 bed Hospital. Consultation included:
Development of LAN Standards
- Hardware
- File Servers
- LAN workstation
- NIC
- UPS equipment
- Tape Backup Systems
- Software
- Network Operating System
- PC Operating System
- Word Processing,
Spreadsheet and Database Software
- Selection
- Cabling
- Network Management
- Network Concentrator Equipment
- Develop PC Purchase Guidelines
Application Interface System
- Design
- Request for Proposal Development
- System Selection
- NEXT,
INC.
- REDWOOD CITY, CA.
Consultation for a 80,000SF hardware
and software development facility. Areas of work included:
Existing Conditions Review
- Network design concept "peer
review"
Infrastructure and Cabling Network
Design
- Development of standard network
implementation approach
- Development of "10Base-T
Ethernet" cabling design and cabling for
same to allow for migration from coaxial to
twisted pair media.
- Design of special equipment rooms
including:
- Digital Lab
- Plotter Server Area
- All Data Equipment Areas
Project Management
- Qualification of cabling and
equipment vendors
- Coordination of entire vendor and
subcontractor team
- Coordination with architectural
and G.C. project team
- Complete CADD project network
documentation
- AUSPEX SYSTEMS, INC.
- SANTA CLARA, CA
Complete cabling design for a 140,000SF
facility, based on special Client requirements. The
unique features of this design included:
- CDDI (100Mg/ps over twisted pair)
implementation
- No backbone, all home-run station
cabling
- Complete specification performed
in two weeks
- NETWORK ASSOCIATES
- SANTA CLARA, CA
Provided Information Technology
consulting and design engineering services relating to
the internal voice and data cabling and the supporting
infrastructure for a new 200,000SF multi-story building.
Work included:
- Development of cabling design
- Final Technical Cabling criteria
- Critical path scheduling
- Complete Base Building
modification including all riser closets, Outside
Plant connectivity
- Design of a 4,000sf computer room,
with the capability to expand to 15,000sf
- All engineering coordination for
Information Technology components of the building
- ELECTRONIC ARTS CORPORATE CAMPUS
- REDWOOD CITY, CA
Complete infrastructure design of two
350,000SF buildings with consideration for future
expansion into three additional buildings.
Work included:
- Complete Base Building design
- Complete voice and data cabling
design
- Review of all internal wiring
- Design and layout of two computer
rooms
- Design and layout of the Media
Laboratory and all equipment rooms
- ELECTRONICS FOR IMAGING
- SAN MATEO, CA
Complete infrastructure design of a new
300,000SF single building on campus, with the capability
of expansion to up to four buildings in the future.
Work included:
- Definition of the Network
requirements and the design and development of
campus-wide infrastructure and subsequent
documentation
- All voice and data cabling design
- Coordination of all Outside plant
connectivity
- Planning and design of future
building to building connectivity
- NETWORK EQUIPMENT
TECHNOLOGIES
- FREMONT, CA
Provided consulting and design
engineering services for the new 280,000SF, three-building
campus and the supporting infrastructure and the final
design, contract negotiation and oversight for the
Engineering Laboratory.
Work included:
- Preliminary review and definition
of Outside plant requirements for future planning
- Definition of network requirements
and campus-wide infrastructure supportive of
Information Technology
- Final technical criteria and
documentation for network cabling requirements
- Managed Cabling vendor selection
- Provided contract administration
services for the entire Information Technologies
project
|